For long drives, rural lots, and budgets that don't stretch to asphalt, a well-built crushed limestone or gravel driveway is a smart choice. Beaumont Asphalt Co. connects property owners across the Golden Triangle with local contractors who build them in compacted layers, so they shed water instead of turning into ruts.
Ready for a driveway that doesn't break the budget? Call Beaumont Asphalt Co. at (409) 403-2056 or request a free estimate online, and a local contractor will look at the site and give you a written quote at no cost.
Gravel is the least expensive way to get a real driveway, but the price swings a lot with how much base work the ground needs. Here are typical 2026 ranges.
| Project | Typical range | What drives it |
|---|---|---|
| Installed gravel or limestone | $1.25–$4/sq ft | Stone type, depth, and how much base prep the site needs |
| Standard two-car driveway | $800–$2,560 | Based on a typical 640 sq ft (16' × 40') driveway |
| Crushed limestone material | About $30–$75 per ton delivered | Grade of stone and haul distance from the quarry |
| Regrade and top-up | $0.25–$1 per sq ft | How rutted it is and how much new stone it needs |
| Upgrade to asphalt later | $3–$7/sq ft | A sound, compacted gravel base can often be reused under the new asphalt |
These are typical Texas market ranges for 2026, published so you can budget before you call. They are not a quote — actual pricing depends on your specific site, and the only number that counts is the written estimate the contractor hands you after measuring.
Soft or wet clay may need to be dug out, covered with geotextile fabric, or built up with a thicker base layer. This is the biggest swing in any quote.
Crushed limestone with fines packs down hard and is the usual choice. Rounded pea gravel is cheaper per ton but rolls underfoot and won't lock together.
A thin layer of stone over bare dirt sinks into the mud. A driveway built in two or three compacted layers costs more and lasts far longer.
Stone is heavy, so trucking is a real part of the price. Long hauls and small loads both raise the cost per ton.
Long rural drives cost less per square foot than short ones, because mobilizing equipment is a fixed cost.
A drive that crosses a ditch may need a culvert, and a flat site may need a crown or side ditches so water drains off instead of through.
The site gets measured and the ground checked for soft spots and drainage, and you get a written quote listing stone type, depth, and base work.
Topsoil and soft material come out, the subgrade is shaped so water runs off, and fabric goes down where the clay is soft.
A base layer of larger crushed stone is spread and compacted, then the surface layer goes on top and is compacted again.
The surface is shaped slightly higher in the middle so rain runs to the edges instead of sitting in the tire tracks.
Tell us roughly how long the drive is. You'll get a real number, free and with no obligation.
Most gravel driveway complaints, like ruts, mud holes, and stone disappearing into the ground, come from skipping the layers below the surface. These are the standards a quote should be written to.
Both make good driveways. They suit different budgets, properties, and tolerance for upkeep. Here's the honest comparison.
A lot of owners start with crushed limestone and pave later. If it's built on a properly compacted base, that base can often stay in place under the asphalt, so the first driveway isn't wasted money. See asphalt driveways for those ranges.
Gravel driveways behave differently on the flat, wet ground around Beaumont than they do in the Hill Country, and a quote should account for that.
Much of the Golden Triangle sits on heavy clay that drains slowly and turns soft after a long rain. Stone laid straight onto it gets pushed down into the mud, which is why fabric and a thicker base layer pay for themselves here.
With very little natural slope, water has nowhere to go unless the driveway is built to send it somewhere. A crown, edge drainage, and a properly sized culvert at the road matter more here than which stone you pick.
Crushed limestone isn't quarried on the coastal plain, so it's trucked in and delivery distance shows up in the per-ton price. Ordering the right amount in full loads keeps that cost down.
Tropical storms push a lot of water across driveways in a short time. A drive built with a crown and good drainage usually needs a quick regrade afterward. One built flat on bare clay can wash out.
Gravel driveways are cheap to build and cheap to maintain, but they do need maintaining. A few habits make the difference between a drive that lasts for decades and one that turns to mud.
Tire tracks collect water, water softens the base, and the ruts get deeper every rain. Regrading once the tracks start to form is quick and inexpensive.
Adding a fresh inch or two of matching crushed stone every few years replaces what gets pushed aside and carried off. Mixing in rounded gravel weakens the surface.
If the center flattens out, water stops running off. Restoring the crown during a regrade is what keeps puddles from forming.
Stone migrating into the yard or a ditch filling with runoff are signs the drainage needs attention before it becomes a washout.
Installed gravel or crushed limestone typically runs $1.25–$4/sq ft, which puts a standard two-car driveway around $800–$2,560. Those are 2026 market ranges, not a quote. Soft ground that needs fabric or extra base costs more. You'll get an exact written number, measured on site, for free.
For a driveway surface, usually yes. Crushed limestone has angular pieces and fine dust that pack together into a hard, stable surface. Rounded gravel like pea gravel looks nice but rolls under tires and never fully locks together.
A typical build is around 4 to 6 inches of compacted base stone with 2 to 3 inches of surface stone on top, more on soft clay or where heavy trucks will drive. Two inches of stone dumped on bare dirt is how most gravel driveways fail.
On soft or clay ground it's one of the best-value parts of the job. Geotextile fabric keeps the base stone from being pushed down into the mud, which is what causes soft spots and stone that seems to disappear.
Not if it's built for it. Washouts happen when stone sits flat on bare clay with nowhere for water to go. A compacted base, a crown down the middle, and drainage at the edges and the road let heavy Southeast Texas rain run off instead of carrying the stone with it.
Expect to regrade and add some stone every one to three years, depending on traffic and rainfall. It's inexpensive compared with resurfacing a paved drive, but skipping it is how ruts turn into mud holes.
Often, yes. If the existing gravel is well compacted and drains properly, it can serve as part of the base for asphalt. A contractor will check it first, because a soft or muddy gravel drive needs work before it can be paved.
If it crosses a roadside ditch, almost certainly. The pipe size is set by the city, county, or TxDOT. See the driveway culverts page for how that works.
Yes. Contractors serve Beaumont and communities across the Golden Triangle including Port Arthur, Nederland, Orange, Vidor, Lumberton and more. See the service area page for the full list.
Every contractor we refer work to is required to be licensed where their state requires it, and to carry current liability insurance — we verify both before sending them a single lead.
Tell us about your project and we'll get you a fast, honest quote — most within the same day.